Casey Industrial was contracted to construct Unit 2 at this existing coal-fired power station. Casey was responsible for balance-of-plant and AQCS construction. Work included erecting an Allied Environmental air quality control system, which included a pulse jet fabric filter, selective catalytic reduction system, electrostatic precipitator, and dry scrubber. BOP construction was comprised of mechanical equipment and all process piping for a new pulverized coal boiler. Casey provided the complete installation of a Toshiba 250 MW steam turbine and associated I&C work.