Casey Industrial was contracted to perform multiple projects over several years at this existing 1,339 MW coal-fired power station. Work included electrical, I&C, structural steel, equipment foundations, and process piping work related to fabric filter upgrades, FGD modifications, limestone slurry dewatering, ash water and bottom ash piping, ductwork, and material handling systems.