Casey Industrial was contracted to install four electrostatic precipitators, two for each 580 MW unit at this existing coal-fired power plant. Casey self-performed mechanical, electrical, and structural.
Installed 500 tons of support steel, 1,000 tons of plate work, 500 tons of duct work, and 6,000 electrodes.