Installation of the Heat Energy section for a greenfield OSB Facility. Casey was contracted for mechanical, structural, and piping, which included the installation of two furnaces, two thermal oil systems, rotary dryers, and dry screens, including cyclones. Other equipment installed included conveyors, pumps, ID fans, fuel pushers, hydraulics, and ductwork.