Casey Industrial managed the SNCR work on Unit 3. The work consisted of new foundations for a truck unloading station, spill containments, tank foundations, and foundations for the circulation and dilution module. Additional civil work included the modification of an existing lime prep area and repairing the culverts. Two new access platforms were fabricated and installed at the injection locations and pipe was run from the truck unloading to the module buildings and to the injection locations. Casey provided all the necessary electrical work, including new transformers, and heat trace systems for the piping.