For this 20 MW Biomass Cogeneration Facility, Casey Industrial was responsible for installing a 20 MW TGM steam turbine, WEG generator unit, and two ESI boilers. Associated work for the installation was self-performed, including concrete, structural, mechanical, insulation, piping, electrical, and I&C.
Installed 10,000 cubic yards of concrete, 701 tons of steel, 41,000 linear feet of piping, 40,400 linear feet of conduit, 16,210 terminations, and 400,000 linear feet of wire.