This 76 MW peaking facility, equipped with selective catalytic reduction (SCR) technology and nine Wärtsilä natural gas-fired engines, was built without delay to meet the summer peak demand. Casey self-performed mechanical, electrical and piping.
Installed 49,634 linear feet of conduit, 168,165 linear feet of wire, 816 terminations, 85 tons of structural steel, and 24,460 linear feet of piping.